Micro electric hoist is a single-phase electric lifting equipment that requires acceptance after purchase. During acceptance, attention should be paid to the following details:
Firstly, after the electric hoist arrives, it needs to be inspected by the construction scope and the supervision unit in accordance with the list. This includes checking the specifications, models, quantities, nameplate parameters of the equipment, conducting visual inspections of components, vulnerable parts, etc., to ensure that they have no defects. At the same time, it is necessary to verify the technical information according to the packing list to ensure their completeness and completeness.
Once the acceptance is completed, it is necessary to handle the handover procedures and sign off on any issues that arise. This can ensure that all parties involved are clear about the quality and quantity of the equipment, and avoid potential issues that may arise in the future.
Before installation, it is necessary to organize installation technicians and civil engineering technicians to conduct intermediate handover and acceptance of the foundation. This requires retesting of the foundation according to the civil engineering foundation drawing and installation technical documents to ensure that it meets the requirements of the technical documents. These steps are all to ensure that the micro electric hoist can be safely and smoothly put into use.