The Jinhaiwan Bridge adopts the innovative construction technology of "cable hoisting+diagonal buckle hanging method", like a skilled craftsman carefully carving this sea dragon.
During the construction process, steel wire ropes play a crucial role. The steel wire rope, as thick as an arm, shuttles tenaciously through the construction site, bearing the heavy responsibility of lifting various large components. Giant steel beams and heavy bridge decks, pulled by steel wire ropes, accurately reach their designated positions and are pieced together to form the sturdy framework of the bridge. Whether under scorching sun or howling winds, steel wire ropes and rigging always remain at their posts, ensuring the smooth progress of construction with their strong load-bearing capacity.
The Jinhaiwan Bridge is a new transportation artery connecting the two sides, greatly shortening the spatial and temporal distance between regions. Connecting regions that were originally separated by the sea has promoted the rapid flow of people and materials. Places that used to require long detours to reach can now be quickly accessed through bridges. It injects strong impetus into economic development, drives industrial development in the areas along the route, promotes trade exchanges, and promotes coordinated regional economic development. Like a golden bond, it connects infinite development possibilities and lays a solid foundation for the prosperity and flourishing of the region.